Enteco News 2017 - N.3 - 28/06/2017

Back to list

ENTECO E9080 SP: THE ADVANTAGES OF SOIL DISPLACEMENT ON THE VENICE-MESTRE (ITALY) WORKSITE

A new multi-storey car park has recently been opened in Venice-Mestre (Italy): this important project commissioned by Grandi Stazioni Rail sits on foundations executed entirely using ENTECO machinery.

The E9080 SP300 drilling rig constructed 191 piles with a diameter of 620 mm and a depth of 29 metres using SOIL DISPLACEMENT technology: these remarkable results were obtained with a technology in which ENTECO has always led the field.

Read the press release »
READ MORE ABOUT ENTECO SP »



 
back to top
Enteco S.R.L.
P.I. 03015640273

Tel. +39 0421 679977
Fax +39 0421 679993

info@entecodrill.com
enteco@gigapec.it


Via Kennedy, 16
Musile di Piave
30024 (VE)
Menù
Company
Products
Technologies
In the World
Used Machines
Media Gallery
Blog News
Press Area
Contacts
Carrer
Reserved Area
Products
E 9000
E 8000
E 7000
E 6000
E 5000
Tunnel
Drilling Rigs
Tools & Accessories
Special Equipment
Technologies
R
CFA
SP
DR
DTH
HG
PD
SM
Utility
Download
Privacy
Legal
Carreer
Link
Newsletter

BE THE FIRST TO KNOW,