Enteco News 2017 - N.2 - 03/03/2017

Back to list

ENTECO E9080 DR: SECANT PILES AT THE UDINE (ITALY) WORKSITE

ENTECO rigs are hard at work in Osoppo (Udine-Italy) to build a protective bulkhead along the Transalpine oil pipeline in the section that crosses the Tagliamento River: this ambitious project involves building around 1600 secant piles with a diameter of 800 mm at depths from 7 to 15 m (centre distance between the piles 60 cm).

Watch the E9080 DR at work in the VIDEO »
Read the press release »



 
back to top
Enteco S.R.L.
P.I. 03015640273

Tel. +39 0421 679977
Fax +39 0421 679993

info@entecodrill.com
enteco@gigapec.it


Via Kennedy, 16
Musile di Piave
30024 (VE)
Menù
Company
Products
Technologies
In the World
Used Machines
Media Gallery
Blog News
Press Area
Contacts
Carrer
Reserved Area
Products
E 9000
E 8000
E 7000
E 6000
E 5000
Tunnel
Drilling Rigs
Tools & Accessories
Special Equipment
Technologies
R
CFA
SP
DR
DTH
HG
PD
SM
Utility
Download
Privacy
Legal
Carreer
Link
Newsletter

BE THE FIRST TO KNOW,