New production plant in Musile di Piave (Ve) - Italy - 27/09/2015

Back to list

The new facilities are built on a total area of 80,0000 sqm. The new 10,000 sqm workshop is 12 meters high, equipped with overhead travelling cranes of 80 tons
capacity, to manufacture and assemble heavy drilling rigs and cranes up to 250 tons in weight. The workshop also contains a large spare parts inventory and an assembly components area. The new facilities include a 3-storey office building with 1500 sqm total area.

The outdoor area includes test fields for several drilling techniques, with the possibility to carry out extensive tests of the rigs before their shipment, and to provide in-depth training programmes to our Customers’ operators.



 
back to top
Enteco S.R.L.
P.I. 03015640273

Tel. +39 0421 679977
Fax +39 0421 679993

info@entecodrill.com
enteco@gigapec.it


Via Kennedy, 16
Musile di Piave
30024 (VE)
MenĂ¹
Company
Products
Technologies
In the World
Used Machines
Media Gallery
Blog News
Press Area
Contacts
Carrer
Reserved Area
Products
E 9000
E 8000
E 7000
E 6000
E 5000
Tunnel
Drilling Rigs
Tools & Accessories
Special Equipment
Technologies
R
CFA
SP
DR
DTH
HG
PD
SM
Utility
Download
Privacy
Legal
Carreer
Link
Newsletter

BE THE FIRST TO KNOW,